Project Record
The Monroe
105 Washington Street · CFS exterior wall packages · Brighton, MA
Project Overview
Project gallery
Field evidence from the documented CFS exterior wall installation.
Scope
CFS work completed for this project
-
01
CFS wall layout coordination
Coordinated wall layouts and three-dimensional documentation address apartment perimeters, corridors, stairs, elevators and service-room interfaces in the reviewed project records.
COORDINATED WALL LAYOUTS PROJECT 0001 -
02
Facade panel packages
Exterior CFS panels are coordinated across the north, south, east and west facades, with elevation and individual FRAMECAD panel documentation.
FOUR FACADES PANEL ELEVATIONS FRAMECAD JOB 1562 -
03
Load-bearing and non-load-bearing wall documentation
The project package distinguishes load-bearing and non-load-bearing wall conditions and identifies the exterior panels from the interior viewing side.
LB + NLB WALLS EXTERIOR PANEL LABELS -
04
Fabrication-ready panel detailing
Individual FRAMECAD Detailer sheets document panel geometry, stud and track sequence, openings, overall length and calculated panel weight for production.
FRAMECAD DETAILER 3-5/8 + 6-IN STUDS PANEL LENGTH + WEIGHT