Cold-formed metal-stud exterior and interior walls for the proposed new Gardner School building at 1410 Providence Highway in Norwood, Massachusetts.
Project Overview
Project gallery
Field views from exterior wall wrap and openings through interior CFS framing.
Scope
CFS work completed for this project
-
01
Exterior wall framing
Exterior walls framed with 6-inch gauge-20 metal studs at 16 inches on center, with exterior gypsum substrate board, vapor barrier and R-21 batt insulation as shown in the wall-type schedule.
6" GA. 20 MTL STUDS 16" O.C. R-21 BATT -
02
Interior partition framing
Interior hallway, classroom and wet-area partitions framed with 6-inch and 3-5/8-inch gauge-20 metal studs at 16 inches on center, full height to the underside of joists, with batt sound barrier where scheduled.
6" + 3-5/8" STUDS STC 51 WHERE SHOWN FULL HEIGHT -
03
Openings and shell coordination
Window and door openings coordinated with the proposed shell plan and elevations for the new Gardner School building in Norwood.