Project Record
MJ PRO Energy
Two-level CFS structure · Franklin, MA
Project Overview
Project gallery
Field and shop views from framing through panel installation.
Scope
CFS work completed for this project
-
01
Two-level wall framing model
Three-dimensional coordination establishes the lower and upper wall geometry within the existing industrial shell.
-
02
Intermediate-floor coordination
CFS horizontal members define the upper floor plane, perimeter support and openings around circulation.
-
03
Stair and roof-plane integration
The preliminary model coordinates the stair run with both levels and maps the upper framing plane across the enclosed structure.